Steel ruler across a technical drawing
Construction & Engineering

Estimating and takeoff, measured from your sheets.

Every quantity in a Primevex estimate is measured from the drawings, checked against the specifications and priced at current rates for the job’s location. You get the number, and you can see exactly how it was reached.

What you get

Estimating & Takeoff

  • Quantity takeoff for one trade or every CSI division in the set
  • Detailed estimate with material, labour and equipment split out
  • Colour-coded markups on your own sheets
  • Editable Excel workbook with the markup cascade in your hands
  • Assumptions and exclusions stated in plain English
  • Unit price schedule or schedule of values when the bid form asks for one
What we need from you

The drawings, The specifications, The bid form, Any addenda. Any format. If the set is incomplete, the free Scope Check tells you before you pay anything.

How it works

Four steps. No surprises.

01Day 0

Send the set, or the site.

Drawings and specs for an estimate. Your current site and goals for digital. A form, an email or a call.

02Within one working day

A fixed price in writing.

Scope, fee and delivery date, confirmed before anything starts. Scope Check reviews are free.

03The work

Measured, built, checked.

Every quantity measured from your sheets. Every page tested on a phone before you see it.

04Delivered

Yours, and then supported.

Editable workbooks, marked-up sheets, a live site you control. Questions after delivery are part of the job.

Prices

The price, on the page.

Every figure is a starting price for a defined scope, confirmed in writing before work begins.

Per project
Scope Check

A first look at your set to tell you whether it is complete enough to price.

Free
2 working days
  • Page by page sheet reconciliation
  • Missing sheets and conflicts flagged
  • Scope extracted, bid or no bid input
  • No card needed, one per company
Get it free ↗
Per projectMost chosen
Bid Ready

A multi-trade estimate for one bid, measured on your own sheets.

$475
4 working days
  • Up to 4 divisions in scope
  • Measured takeoff, scale verified both axes
  • Colour coded markups on your own sheets
  • Editable Excel workbook, markup cascade in your hands
  • Assumptions and exclusions written out
Request this ↗
Per project
Full Building

Every trade in the set, priced as one building.

$775
5 to 7 working days
  • All CSI divisions in scope
  • Everything in Bid Ready
  • Unit price schedule or schedule of values
  • Priced alternates and options
  • A person who will defend the number
Request this ↗

Scope not on the list? Phased work, several buildings, a set over 120 pages or a turnaround you need brought forward. Send it and the fee comes back in writing.

Request a quote ↗
Questions

Asked before the first job.

Can you price just my trade?

Yes. Single trade, a group of divisions, or the whole building.

Do you include prevailing wage?

When the job requires it, yes, at the published rates for that county.

What if an addendum lands mid-estimate?

It gets priced in. If it changes the scope, the fee change is quoted to you before the work is done.

Start a project

Tell us what you are bidding or what you want to grow. A written price comes back within one working day.