A construction site with tower cranes and concrete trucks under a clear sky
Industry · Construction

More bids out the door, same team.

For general contractors, specialty contractors and subcontractors who lose jobs because nobody had time to price them.

01 · Needs

What you need that a generalist does not produce.

01

Takeoff for your trade or the whole set

02

Pricing at local rates

03

Bid forms completed

04

A date you can count on

02 · Evidence

The evidence.

Sourced figures only. Every number links to where it came from.

10 to 25%

Hard-bid win rates typically sit between 10 and 25 percent, so most estimates never turn into work.

3 to 4%

Estimating can cost a specialty contractor 3 to 4 percent of revenue.

77%

77 percent of firms hiring salaried staff report difficulty filling estimating roles.

Start here

Send the drawings. Or the domain.

A free scope check tells you whether the set is complete before anyone prices it. No card needed, one per company.